Community Housing Authority

The Problem

Section 8 housing that had a extensive demolition.

Traditional Solution

Fire Walls needed to be repaired. There was extensive damage to the walls after a flood. The new code required 2 layers of gypsum and the project only had room for 1 layer.

FlameOFF® Solution

Apply fire coating to wall and ceiling areas requiring the additional rating. With the use of the Intumescent coating the problem was solvable by coating.

Estimated Savings

$63,300

Actual Time Savings

45 Calendar
Days